The Ridgeway Town Ditch
The Ridgeway Town Ditch
On August 12, 2024, Beaver Creek unleashed a powerful debris flow that dramatically altered the historic Ridgway Town Ditch. Tons of rock and mud buried segment four including the intake structure, the “Grizzly” sediment-settling channel, and nearly 1,000 feet of the ditch. The force of the flow even carved a new streambed, leaving the old diversion point perched 10 feet above the creek—completely unusable. The flume that once carried water across Beaver Creek was swept away. The town rebuilt the flume immediately.
To keep water flowing to the Town of Ridgway, the NRCS Emergency Water Program stepped in to fund critical repairs. NRCS is funding piping approximately 1,000 feet of segment 4, a new debris basin the Grizzly, check structure, intake structure, rock rundown structure, as well as restoring the stream channel with six check dam structures, and a precipitation gauge. Every repair tells a story of resilience. This Story Map documents those changes, ensuring that while the system adapts to modern needs, its legacy remains part of Ridgway’s heritage.
Author: Katie Arntzen
Keywords: Ridgway, Municipal, Beaver Creek, Ouray